Hoboken, NJ — all 1.28 sq mi Insured in New Jersey Free written estimates
(551) 230-0252
Roof Replacement · Hoboken NJ

Roof Replacement in Hoboken, NJ

Tear-off to the deck, sound insulation, the right membrane for how the roof is used, and parapet and flashing details that are the actual reason a Hoboken roof lasts or fails. One written estimate, before anything starts.

  • Written estimate, not a phone quote
  • 20–30 yr material warranty
  • Permits & historic review handled
Scaffolding erected for a Hoboken roof replacement
Full tear-off, standardEvery job starts at the deck, never over an old layer.
2–4 daysTypical row-house timeline
3 systemsMod-bit, EPDM & TPO
20–30 yrMaterial warranty range
WrittenScope & price, before work starts
Choosing a system

Three membranes. One is right for your roof.

We recommend one system in writing, with the reasoning — not a menu to pick from blind.

SystemBest forWhat to know
Modified Bitumen Pre-1940 brownstones & row houses, torch-down or self-adhered The traditional match for older parapet roofs. Multi-ply, forgiving of an imperfect deck, easy to detail around chimneys and old penetrations. Heavier and more labor to install than single-ply.
EPDM (rubber) Walk-ups and mid-rise roofs with simple geometry Single-ply rubber sheet, fully or mechanically adhered. Excellent puncture and UV resistance, proven 20–30 year lifespan. Black surface runs hotter in summer than TPO.
TPO Roof decks, amenity space and high-rise roofs carrying equipment White reflective single-ply, heat-welded seams. Lower rooftop temperatures, strong seam strength for a roof that takes foot traffic. Installer quality matters more — a bad weld is the failure point.
What’s included

What a proper replacement actually covers

Not just a new membrane on top of the old one — the parts that decide whether it lasts.

1

Full tear-off

Every old layer removed down to the deck — not a re-cover. You cannot properly inspect or warranty a roof you built on top of a problem.

2

Deck inspection & repair

Rotten or delaminated sheathing found once the old membrane is off, and replaced before anything new goes down on top of it.

3

Insulation

Rigid board insulation sized to current code, sloped where needed to route water to the drains instead of letting it pond.

4

Membrane installation

The system specified in your estimate, installed to the manufacturer’s detail — the difference between a warrantied roof and a voided one.

5

Parapet & flashing

Coping, counter-flashing and the party-wall turn-up rebuilt properly. This is where almost every Hoboken roof actually leaks.

6

Drains, cleanup & warranty

Drains and scuppers cleared and tied in, site cleaned and hauled, and material plus workmanship warranty documents handed over.

Pricing

What actually moves the price

Six factors, in the order we check them on the inspection.

  1. Roof size and shape. Square footage first, then how many parapet corners, offsets and level changes there are to detail — a simple rectangle costs less per square foot than a broken-up roofline.
  2. How many old layers come off. A roof re-covered twice before has three layers to strip. More tear-off, more disposal weight, more labor hours before day one of the new roof even starts.
  3. Deck condition underneath. Sound plywood or original timber deck versus rotten sheathing that needs replacing — this is the number we cannot confirm until the old membrane is off.
  4. System selected. Modified bitumen, EPDM and TPO carry different material and labor costs. We price the system that fits the building, not the cheapest option by default.
  5. Access and logistics. A row house with roof access through a top-floor hatch costs less to run than a building needing a hoist, crane, or street closure for material.
  6. Drains, penetrations and equipment. Every drain, vent, skylight and rooftop unit is a detail that takes time to flash correctly — more of them, more labor.
How the job runs

From first look to final flashing

Four stages, and you know the price before stage three begins.

1

Inspection

We get on the roof. Deck soundness, drains, parapet and coping condition, and how many layers are already there.

2

Written estimate

System recommendation, full scope and price in writing, with photos. No verbal number before the inspection.

3

Permits & access

Building permit filed, historic review scheduled if the block requires it, street occupancy and roof access arranged.

4

Build & close out

Tear-off, deck repair, insulation, membrane, then the flashing details that decide whether it lasts. Warranty handed over.

20–30 yrManufacturer material warranty, depending on system selected
WrittenWorkmanship warranty on every installation, no verbal-only coverage
FullTear-off standard — no membrane installed over an old, unverified layer
FiledPermit and historic review, handled as part of the job, not left to you
Service area

Every Hoboken neighborhood

One square mile. Wherever your building sits, it is the same crew and the same written estimate.

Free estimate

Tell us about the roof

We will come and look at it, then send a written estimate with photos and a clear scope. No obligation — and no price quoted over the phone before anyone has seen the building.

  • On-site inspection at a time that suits the building
  • Written scope, materials and price — not a verbal ballpark
  • Honest repair-versus-replace advice, in writing
  • Owners, landlords, boards and building managers all welcome

Prefer to talk? Call (551) 230-0252.

We reply the same business day. Your details are used only to quote this job.

Questions

Roof replacement — straight answers

How much does a roof replacement cost in Hoboken?

It depends on roof size, deck condition, how many old layers have to come off, and access. A single row-house roof and a large mixed-use building are not the same job. We give you an exact written number after an on-site inspection, not a phone estimate.

What roof system should I choose?

For almost every Hoboken building it is modified bitumen, EPDM rubber or TPO membrane, not shingles. Which of the three depends on your budget, roof traffic, and whether the roof will carry equipment, a deck, or pavers. We recommend one system in writing with the reasoning, not a menu.

How long does the job take?

A typical row house or small walk-up is two to four days in dry weather. Larger or mixed-use buildings run longer. Weather is the main variable because membrane cannot go down on a wet deck.

Do you handle the permit and historic review?

Yes. We file the City of Hoboken building permit as part of the job, and if the building sits in the Southern Hoboken Historic District along Washington Street, we build the review into the schedule before we quote a start date.

See what a proper replacement costs, in writing

An inspection, photographs and a written estimate — at no cost and with no obligation.

Call (551) 230-0252